The apartment is coming along really well. The floors have all be refinished. The tile in the bathroom is done,
and the vanity put in place.
and a new entry door. But a couple of weeks from now we should, hopefully, be almost done. The electrician comes in Monday to wire the long arm studio, and then we can get at putting up the insulation and the dry wall. And then, we will be able to move all my long arm stuff, and I can get back to doing what I love to do - quilting my own and other people's quilts. This is what the entrance to my new space looks like.

And, I've met one of my January goals. The bin that looked like this
One goal down, 3 more to go. And I now have a lot more little bitty 1 1/2 inch strips and pieces and a lot more crumbs.