Leo’s Mane Sew Along

Sunday, 30 November 2014

Stash Report, week 48, 2014

After all the sewing during our guild's two day sew-in, I have some stash used. A border for the Triple four patch quilt and 8 blocks for it...... the rest was already counted. I did a backing for the Blooming Nine Patch quilt, and then started using up some four patches in a Sister's Choice variation. I'll count stash used for those blocks as I make them.

Used this week:                       5.6 yards
Used this year:                      111.4 yards
Added this week:                        0 yards
Added this year:                    125.75 yards
Net added                               14.35 yards

This is going to be a brief post, as there isn't a whole lot else going on today. I went' out to the yarn store and picked up some stuff to make Avery a sweater for Christmas. And, considering yesterday during our sewing time, someone pointed out to me that tomorrow is the first of December, I'd better get moving on it. I'm not sure what happened or how, but somewhere along the line I've lost a few weeks.
In the meantime, I'm linking up to Judy's Stash Report

Saturday, 29 November 2014

Scrappy Saturday, sew-in day 2

What a wonderful couple of days, so much fun, and I got so much done!! My triple four patch that I started last November for the Scrappy Saturday Rainbow Colour Challenge, is a finished top. And I love it!! There's something wrong with the right hand border.... the end units are turned the wrong way, somehow, but I don't care. It's staying in it's imperfection.


After I finished the triple four patch quilt, I started on these squares. I have a whole bag full of these little four patches, so I'm going to make them up into these Sister's Choice variation blocks. They'll use up those four patches, and some more yardage and also some 2 1/2 inch scrap strips for the triangles. The plan right now, is to use orange in the same place in all the blocks. I'm not sure if I have enough bright bold oranges, but I'll use up what I have and go from there. I have enough triangles made up to do three more blocks. But I think I'm done sewing for the next day or two.... I've kinda over dosed a bit, but it sure was fun. I'm going to link this up to Soscrappy for the rainbow challenge saturday post. This month's colour was actually light blue, which I didn't get anything done with. But the finish of the quilt from last year is rather exciting. After I post this, I think I'm going to just sit quietly and knit.

Friday, 28 November 2014

Sew In day 1

Just a quick post to show what was accomplished today.
All of my triple four patches are sew together into the top. Tomorrow, I will finish off the borders.

The Blooming Nine Patch is now a finished top. And it also has a finished backing.  There's a close up here, of some of the really cute animal faces poking out behind the balls of yarn, and the blue berry bushes. I'll get better pictures out in the daylight, some other time. It was a fun day, with lots  accomplished. And I'm hoping to get lots done tomorrow, too.

Thursday, 27 November 2014

On my Needles......

I haven't done a knitting post for a while, although I have been doing a lot of knitting. It just seems that every time I thought of taking a picture of my sweater, it was at a stage where I couldn't take a picture. This is my Carabe sweater. It is so very close to being done. I've enjoyed doing this one, and I've learned a couple of new techniques while doing it, too. A new method of button holes, and a new method for casting off stitches. I liked both new methods. I'm also liking the way this one is fitting. It's a little looser than the last few sweaters I've done, which will make it a bit more versatile. However, I won't be doing any knitting on it over the next couple of days, though. The guild is hosting a sew-in mini retreat. We'll meet at 9 am until 9 pm both Friday and Saturday, and sew until we drop. At which point we can go home to our own beds to sleep. I have plans...... big plans, for what I want to get done. Whether I get there right at 9 am........ not likely. It'll probably be closer to 10. I've made myself a list of what I want to take. Now, all I have to do is round it all up and get it ready to go into the car in the morning. Depending on how I feel when I get home tomorrow night, I might post a progress report. In the meantime, I'm linking up to Judy's On the Needles.

Wednesday, 26 November 2014

What I'm Working on.......

The Blooming Nine Patch is finally done to the point where I was able to get it off the wall. Now, I've put up the Rainbow triple Four Patches. I've been playing with the layout this afternoon, and I think I've decided I like this one best. I still have one more red square to make, and the eight orange squares before I can start putting this one together. I'm hoping to at least get the last red one done tonight.
I had a bit of a funny happen today. Our guild is doing a Canadian themed Row of the Month quilt, and I'm writing up the instructions. Once I get them written up, I send them off to the other members of the program committee for testing to make sure there are no mistakes in them. This months' row is fairly simple in construction, but it requires some attention payed to the placement of colours and direction of different pieces. All through writing the instructions, I emphasized the care needed in the placement and directions of the fabrics. I even took pictures as I made my own block as an example. Imagine my embarrassment when one of the testers emailed me to let me know that the patches in my example square were going in the wrong direction from the layout picture. Oops...... It's all fixed now, and the revised version is now in their hands, or at least their email inboxes. My task this evening..... rip out the 2 1/2 blocks that I've already done, and get the fabrics going in the right places. And maybe, just maybe, I'll get the last red square done, and the oranges cut to finish this quilt.
Before I do that, I'm going to link up to The Needle and Thread Network.

Sunday, 23 November 2014

Stash Report, Week 47, 2014

I've been sewing this week. I finished up, almost, the red triple four patches that I'm doing for the Scrappy colour challenge, and I also cut out and partially assembled the next row for our Canadiana Row quilt for the guild. That used a little bit of stash. I received in a lot more.
There are some blacks and reds and greys and golds that I'm collecting that are, right now at least, planned for a Lady of the Lake quilt that I want to do. The whites with blacks are for the +&x quilt that I started a while back. And the bottom row of fabrics are just because I liked them and thought they would make a pretty quilt for something, but I'm not sure what, just yet. There are a total of 31 fat quarters there, which add up to 7.75 yards.

Used this week:                          1.3 yards
Used this year:                        105.8 yards
Added this week:                          7.75 yards
Added this year:                    125.75 yards
Net added:                                     19.95 yards



There isn't a lot else happening here today. Just some hanging out on the couch, and playing mindless games on the computer. I've also been playing in Electric Quilt, and I think I have a plan for my Scrappy Triple Four Patch quilt. Wanna see. or is that a silly question? The outer double four patch border will also be scrappy, as will the checker boards at the top and bottom of the quilt. I think it measures something like 80x100. It might end up with an outer plain border, just to stabilize it. That will depend on what I find in the stash, since I really don't want to have to purchase anything for it, since that would kinda defeat the purpose of the scrappy challenge.
I'm Hoping to have my Blooming Nine Patch off the wall, and put this one up this week. All that is left to do for this one is 8 orange blocks, and then I can start to assemble this one. I'm linking up to Judy's Stash Report.

Wednesday, 19 November 2014

Wednesday Progress Report.....

I've managed to get a whole lot more rows done on my Blooming Nine Patch. All that's left is that top right hand corner. I've run out of the nine patches needed for the outer row, so I have to make nine more before I can go any further. With every section that gets sewn together, I like this quilt more and more. When I first made the fabric selections, especially the black, I really wasn't sure how it was going to work out. At one point, I was thinking that I would either shelve it, or end up giving it away. But not now..... it is going to live right here, and might even jump to the head of the line for my projects that need quilting. I think an over all floral would be perfect for it.
I'm linking up to Canada's Needle and Thread Network, and then I think I'm going to call it a day.