I have a slow stitching, or make that slow knitting, finish this week The pattern is called
Canyon Road. I have fallen in love with this persons patterns and have happily fallen into the rabbit hole of colour work sweaters.

It still needs to be blocked. After it is blocked the lace and colour work around the yoke will be even prettier.

I have some yarn left from this one, but of course it wasn’t enough to do a full sweater so of course I had to order more yarn. And then after I ordered the yarn to make up the difference so I could make another sweater, I got a notification that I had reached a milestone and therefore had a $25.00 store credit. Which meant, you guessed it, I ordered yet more yarn. With the yarn I already have here and the yarn that is coming I figure I have enough to do 5 more sweaters. And that’s not counting all the leftovers from all the other projects. Yep, I’m building a whole second stash, with yarn instead of fabric.
In between the knitting I’ve been working on my Hold Onto Your Heart design by Esther Aliu. I’m working on the houses and the foliage surrounding them.
Her design for the houses had shutters by the windows. I’ve left those off and have instead added some lace trim inside the windows for curtains. I’m doing embroidery for the stems of the foliage rather than using bias fabric. This afternoons job is to prepare the leaves and get them glue basted in place. And maybe get some more of the stems done.