Leo’s Mane Sew Along

Sunday, 28 November 2021

Slow Sunday Stitching

 How did that week go by so fast? I mentioned last Sunday that I had some quilty finishes that I would share later in the week and somehow the week got away from me. I’ll try to do better this week. I want to keep my Sunday posts mostly about hand work. 

I’m making good progress on all my current hand work projects. My socks are almost done. An hour or so today should finish them. I like having a pair always on the go. They are mostly simple mindless knitting, good for late evenings when I don’t want to have to think or pay close attention to what I am doing. This sweater on the other hand, takes thought and concentration to keep track of where I am on the sleeve pattern. But I like the results. It’s slow going, but worth it. I have to tick off every line of the chart as I do it otherwise I will end up totally not knowing where I am at. And then there is my Peppermint Purple stitch along. There are only 5 spaces left to fill and then it is done for the year. As it stands now, I’m not planning on doing any stitch alongs next year. I have other cross stitch pieces that I want to work on that will keep me occupied for most of the winter. But I will wait until this is done before picking them up. I really want to get back at the Harbour Village piece that I started. But I suspect if I set this aside and work on something else, this won’t get finished. So I will exercise a small amount of self discipline. The harbour Village piece has waited this long, so it can wait another month. 

I’m linking up with Kathy’s Slow Sunday Stitching.







Sunday, 21 November 2021

Slow Sunday Stitching

 I’m continuing on with my current slow stitches, my Anisia Sweater and the Peppermint Purple 2021 stitch along. I had to set the sweater aside for a few days while I waited for the yarn shop up here to be open. I broke the needle size that I needed for the bottom ribbing on a Saturday evening and the shop was closed Sunday and Monday. And of course I couldn’t have nothing to knit on while I waited, so I started a pair of socks. I got to the store to buy the needles I needed and got the bottom ribbing done so it was then time to start the sleeves. And as much as I searched everywhere, I couldn’t find the needle sizes in double pointed that I needed for the sleeves. So back to the store I went for double pointed needles. I managed to find in my needle stash every size except for the ones I needed. I don’t know if I had them and lost them or never had them to begin with.  Anyhow, all is good again. I am thankful for a local yarn shop that is well stocked and only 5 minutes away. It is called Knitting Three Together. So here is the sweater with the sleeves started and the body finished. For the socks I grabbed a ball of wool from my stash that had all kinds of fun bright colours to counter act a bit the very dark grey days we’ve been having lately. And then the stitch along project is here. 

I have yet to do this week’s square. That is on my to do list for part of today’s stitching. I’d rather not fall behind again if I can help it.

I’m linking up to Kathy’s Slow Sunday Stitching.

I actually have some quilty stuff to talk about, but I’ll do a separate post about that later this week.